Yenikend Fish farm (Neftchala, Azerbaijan) Construction of 3550 m² industrial building, 1150m administrative building, 450 m² canteen building on 75ha area, reconstruction of water wells on a 35ha area, construction of 2 pump house buildings and 1 boiler house building and installation of equipment, other infrastructure construction works. Project start and end date: 2019 – 2021.
The main contractor: “ArchiCO” LLC
Hazelnut processing factory in Zaqatala
Total area: 10ha
Total construction area: 11000 m²
Project year: 2019
The main contractor: “ArchiCO” LLC
Construction of hatchery factory at the territory of total area 2700 m² on 4ha area, open parking lot, water reservoirs and other construction of infrastructure facilities. Project start and end date: 2019 – 2020.
The main contractor: “ArchiCO” LLC
Construction of cold storage for storing fruits in 43 cold rooms, 4 room fast-refrigeration, handling and sorting fruit warehouse with a total area of 11460 m² in the Gusar region. Project year: 2022
The main contractor: “ArchiCO” LLC
Design and construction of vegetable storage.
Baku city, Gala district.
The main contractor: “ArchiCO” LLC